Current through Register Vol. 52, No. 1, January 10, 2025
Section 15.20.01.06 - Construction and Maintenance CriteriaA. In-stream Excavation. Except with the written permission of the Secretary of the Department of Natural Resources, in-stream excavation or clearing is prohibited between the following dates: (1) October 1 through April 30 in natural trout waters;(2) March 1 through May 31 in recreational trout waters; and(3) March 15 through June 15 in anadromous fish spawning waters.B. Clearing and Snagging. (1) Clearing and snagging of a channel may not endanger channel stability.(2) The areas to be cleared and snagged shall be limited to: (a) The channel bottom, banks, and berms;(b) Adjacent trees or other objects that may fall into a channel;(d) Temporary disposal areas; and(e) Areas designated by a soil conservation district for planned conservation areas.C. Revegetation. (1) On each project, a species of erosion controlling vegetation adapted to the area and a proven method of vegetation establishment shall be used for revegetation.(2) Provisions shall be taken on a project to reduce soil erosion until effective revegetation can be accomplished.(3) During the growing season, at a minimum: (a) Channel banks shall be seeded at the end of each day's excavation; and(b) Other areas where soil has been disturbed shall be seeded within 7 days of final soil disturbance.(4) The progress of revegetation shall be monitored by the association and corrective action taken when necessary.Md. Code Regs. 15.20.01.06