Within 30 days after the receipt of an application, the Foundation shall notify the landowner whether the application is sufficient. If the application is insufficient, the Foundation shall specify the reason for insufficiency and grant the owner an additional 30 days to remedy the insufficiency. If the application is made sufficient within 30 days of the notification by the Foundation, the application shall be considered as if it had originally been submitted in a timely and sufficient manner.
Md. Code Regs. 15.15.01.08