Current through Register Vol. 51, No. 12, June 14, 2024
Section 14.30.05.04 - Extension of Time PeriodsThe Board or the Executive Director may extend a time period not prescribed by statute. This may happen:
A. Before the initial time period ends, without motion or notice, if good cause for the extension is shown; andB. After the initial time period ends, upon written motion filed with the Executive Director, if the failure to act was the result of excusable neglect or good cause.Md. Code Regs. 14.30.05.04
Regulation .04 adopted effective 51:9 Md. R. 441, eff. 5/13/2024.