Md. Code Regs. 11.04.11.06

Current through Register Vol. 51, No. 18, September 6, 2024
Section 11.04.11.06 - Procedures
A. To obtain a containerized cargo permit, the applicant shall submit, directly to the Unit, an original signed and completed application on a form and in a manner prescribed by the Unit. The applicant shall allow 5 working days for processing the permit request.
B. The Unit may issue a containerized cargo permit that is valid for 1 year.
C. The Unit shall complete all blanks on the face of the containerized cargo permit before issuing the permit directly to the applicant.
D. The permittee shall sign the permit upon receipt.
E. The permittee or user of a containerized cargo permit shall carry the original (not a copy) of the permit on the overweight vehicle when moving the vehicle on a highway in the State.
F. The permit vehicle may travel permitted routes on a 24-hour daily basis.
G. A permittee shall comply with all restrictions attached to the permit as well as any hauling permit restrictions posted on the Motor Carrier Division and CHART websites found at www.marylandroads.com. It is the responsibility of the permittee to review these websites for current hauling permit restrictions prior to any move being made under authority of this permit.

Md. Code Regs. 11.04.11.06

Regulations .06 adopted as emergency provision effective September 24, 1986 (13:21 Md. R. 2312); adopted permanently effective December 15, 1986 (13:25 Md. R. 2662)
Regulation .06A amended effective March 22, 2010 (37:6 Md. R. 479)
Regulation .06G adopted effective March 22, 2010 (37:6 Md. R. 479)