Md. Code Regs. 10.15.06.15

Current through Register Vol. 52, No. 1, January 10, 2025
Section 10.15.06.15 - Milk Facility Construction and Plan Submission

Under the standards set forth in the Grade "A" Pasteurized Milk Ordinance, for construction, reconstruction, or extensive alteration of a milk facility, a person shall submit to the Department:

A. Plans and specifications before:
(1) Constructing, reconstructing, or extensively altering a milk facility;
(2) Converting or remodeling an existing building or structure for use as a milk facility;
(3) Adding, replacing, relocating, or modifying a milk facility process; or
(4) Adding, modifying, or replacing a clean-in-place (CIP) or other washing system or any part of a clean-in-place or other washing system;
B. Plans and drawings bearing the name of a professional engineer or a representative of the company performing the work.
C. Contact information for the facility, including:
(1) The full name, title, and telephone number of each applicant;
(2) The name of the plant;
(3) The mailing address;
(4) The location; and
(5) Directions to the site;
D. A narrative describing the scope and purpose of the project, including a projected time line from start to completion;
E. An estimate of finished product output per day;
F. Sample product labels for each product;
G. A list of:
(1) All products to be produced;
(2) Raw cream and skim, condensed, or any other milk or milk products to be sold; and
(3) Single service container sources;
H. A scale drawing showing the layout and arrangement of areas within and around the milk facility, including areas for.
(1) Processing;
(2) Chemical storage;
(3) Dry storage;
(4) Ingredient and product storage;
(5) Receiving;
(6) Load out;
(7) Laboratories;
(8) Offices;
(9) (text unchanged)
(10) Lockers or a facility for the storage of personal items; and
(11) Employees to eat and drink beverages;
I. A scale drawing showing the location of all equipment, including:
(1) Pasteurizers and sterile systems;
(2) Milk processing equipment;
(3) Fillers;
(4) Raw and pasteurized tanks and silos;
(5) Clean-in-place (CIP) systems;
(6) Glycol water tanks;
(7) Recirculating cooling water tanks;
(8) Boilers;
(9) Boiler makeup tanks;
(10) Culinary steam systems; and
(11) Blow mold systems;
J. A scale drawing showing the location of plumbing and plumbing fixtures, including:
(1) Water lines;
(2) Sewer lines;
(3) Hand sinks;
(4) Toilets;
(5) Utility sinks;
(6) Utensil washing sinks;
(7) Floor drains;
(8) Floor sinks;
(9) Hose stations; and
(10) All back flow prevention devices;
K. A legend for all drawings;
L. Specifications for:
(1) Ventilation including, but not limited to, the type and location of:
(a) An air filter,
(b) An air pump; and
(c) A compressor,
(2) Construction materials for the building and interior finishes; and
(3) Pasteurizer plate coolers, if separate from the pasteurization system;
M. A list and description of all boiler, glycol, and recirculating water additives and water treatment;
N. A description of the:
(1) Type of disposal for wastewater and sewage;
(2) Source and system for the facility's potable water supply;
(3) Lighting fixtures and placement; and
(4) Recirculating cooling system; Specification sheets, including manufacturer and model number of all milk facility equipment;
O Specification sheets, including manufacturer and model number of all milk facility equipment;
P. A document that lists the flow for all products through the plant, grouped in categories, identifying each functional piece of equipment and each process used in processing and packaging, including:
(1) Reclamation systems;
(2) Standardization procedures or formulation procedures, or both;
(3) Vitamin addition protocol; and
(4) Draining of product lines;
Q. Plans, specifications, drawings, and flow diagrams for each high temperature short time (HTST) and higher heat short time (HHST) system, showing each functional component;
R. Clean-in-place (CIP) flow diagrams from the makeup tanks through all equipment;
S. Information and drawings on how separation from product lines will be accomplished, if applicable;
T. Written step-by-step standard operating procedures for:
(1) Receiving, processing, storing, and packaging of each project;
(2) Antibiotic testing procedures, if applicable;
(3) Cleaning and sanitization for all equipment;
(4) Cleaning and sanitization for the facility;
(5) Product trace back, inclusive of production or make sheet; and
(6) Product recall;
U. A pest control program; and
V. Employee training and personal hygiene practices.

Md. Code Regs. 10.15.06.15

Regulations .15 adopted effective March 19, 2010 (37:4 Md. R. 341); amended effective 44:4 Md. R. 254, eff. 2/27/2017