C.M.R. 13, 188, ch. 60, Operational Plan for the Restoration of Shad and Alewives to the Kennebec River, app 188-60-2

Current through 2024-25, June 19, 2024
Appendix 188-60-2 - Kennebec River Basin Fish Passage Action Plan for Shad and Alewives August, 1986

UPSTREAM PASSAGE

RIVER/TRIBUTARY DAM REQUIRING FISH PASSAGE REMARKS
Kennebec River Edwards Dam (FERC #2389) A fish passage, sorting, & transportation facility is requested for completion by the spring of 1987.
Sebasticook River Halifax Dam (FERC #2552) Fish passage, trapping & sorting facility requested to be operational by May 1, 1999.
Benton Falls Dam (FERC #5073) Fish passage requested to be operational by May 1, 1999.
Burnham Hydro Dam Fish passage is requested to be operational by May 1, 2000.
Upstream fish passage on all tributary dams to Sebasticook River deferred until May 1, 2000. The feasibility of permanent trap & truck for alewives in lieu of fish-ways in tributary dams to be evaluated during the 14 year period.
Kennebec River Lockwood Dam (FERC #2574) Fish passage, trapping & sorting facility requested to be operational by May 1, 1999.
Winslow Dam (FERC #2611) Fish passage requested to be operational by May 1, 1999.
Shavmut Dam (FERC #2322) Fish passage requested to be operational bv May 1, 2000.
Weston Dam (FERC #2325) Upstream fish passage requested to be operational by May 1, 2001.
Sandy River Madison Electric Works Das Fish passage requested to be operational by May 1, 2002.
Upstream passage for dams on the Wesserunsett Stream drainage deferred until 2G01. Upstream passage for tributary dams on the Sandy River are deferred until 2003. The feasability of permanent trap & truck for alewives in lieu of fishways to be evaluated during this time period.
When a dam is redeveloped the dam owner should seriously consider installing fish passage facilities at the time of redevelopment to prevent costly retrofitting. As a minimum, the dam owner is requested to prepare a conceptual design of the fish passage facility (ies) for review by the state & federal fisheries agencies & to include appropriate provisions during redevelopment in order to preclude costly retrofitting.

DOWNSTREAM PASSAGE

Permanent downstream passage is requested to be operational at the following dams on the specified dates:

Edwards Dam (FERC #2389) 1987
Halifax Dam (FERC #2552) 1991
Benton Falls Dam (FERC #5073) 1991
Burnham Hydro Dam 1991
Pioneer Dam (FERC #8736) 1991
Waverly Avenue Dam (FERC #4293) 1991

Until permanent downstream passage facilities are operational, it is requested that the dam owners provide interim downstream measures such as controlled spills, directed .flows through a slot in the flashboards, etc. These temporary measures are requested for those dams listed above once anadromous fish have been stocked above them and for the following dams after 1993:

Lockwood Dam (FERC #2574)

Hydro-Kennebec (FERC #2611)

Shawmut (FERC #2322)

Weston (FERC #2325)

Madison Electric Works Dam

Permanent downstream passage facilities for the Lockwood Dam (FERC #2574), Hydro-Kennebec (FERC #2611), Shawmut (FERC #2322), Weston (FERC #2325), and Madison Electric Works Dam are requested to be operational at the same dates as required for upstream passages.

C.M.R. 13, 188, ch. 60, Operational Plan for the Restoration of Shad and Alewives to the Kennebec River, app 188-60-2