Leach fields less than 2,000 gpd: 50 feet
Leach fields equal to/greater than 2,000 gpd: 100 feet
Septic tanks, lift stations & holding tanks: 30 feet
Private potable water supply well: 45 feet
Public potable water supply well with a withdrawal rate equal to or less than 10 gpm: 45 feet
Public potable water supply well with a withdrawal rate greater than 10 gpm but equal to or less than 25 gpm: 75 feet
Public potable water supply well with a withdrawal rate greater than 25 gpm but equal to or less than 50 gpm: 125 feet
Public potable water supply well with a withdrawal rate greater than 50 gpm: 200 feet
(Withdrawal rate is determined based on the nominal size of the actual well pump installed in the well) Property lines: 10 feet
Table 604.1 Pressure ratings and applicable standards for high density polyethylene pipe:
Nominal Diameter | Pressure Rating (psi) at 73.4[DEGREE]F | Applicable Standard |
< 11/14 in. | 160 | IGSHPA standards |
11/14 - 3 in. | 110 | IGSHPA standards |
> 3 in. | 100 | IGSHPA standards |
Table 604.2: Pressure ratings of water filled pipe at 73.4[DEGREE]F for DR-PR PE 3408/3608 plastic pipe:
Dimension Ratio | Pressure Rating (psi) |
9 | 200 |
11 | 160 |
13.5 | 128 |
15.5 | 110 |
17 | 100 |
Table 604.3: Pressure ratings of water filled pipe at 73.4[DEGREE]F for DR-PR PE 47102 plastic pipe:
Dimension Ratio | Pressure Rating (psi) |
9 | 252 |
11 | 202 |
13.5 | 161 |
15.5 | 139 |
17 | 126 |
21 | 101 |
Table 604.4: Pressure ratings of water filled tubing at 73.4[DEGREE]F (23[DEGREE]C) for DR-PR PEX 1006 or PEX 1008 plastic pipe:
Dimension Ratio | Pressure Rating (psi) | Applicable Standard |
9 | 160 | IGSHPA standards |
Metal cold compression sleeve fittings should conform to IGSHPA standards for Cold-Expansion Fittings with Metal Compression-Sleeves for Cross-Linked Polyethylene (PEX) Pipe. Cold compression sleeve fittings should conform to IGSHPA standards, and have a minimum inside diameter of 82% of inside pipe diameter.
Only potable water may be placed inside the pipe to add weight to the pipe loop. Using steel pipe for the tremie can assist in the placement to the bottom.
The loop assembly shall extend to the bottom of the borehole. If an obstruction is encountered in the borehole, preventing the installation of the loop to the borehole bottom, the loop and the obstruction must be removed or provisions made for the sealing of the borehole below the obstruction and the designer needs to be notified so adjustments can be made to the design of the system.
The drilling contractor shall provide the owner/designated agent with "as-built" drawings of the installation. Such drawings shall show sufficient detail to locate the boreholes, show the finished borehole depth, and actual borehole heat exchanger lengths.
10-144 C.M.R. ch. 232, § 6-600.0