The following persons are not required to obtain a license:
The certification must be made by a person authorized to sign a license application under Section 10(A)(3) of this Chapter, and such certification must read:
I certify, under penalty of law, that the requirements of 06-096 C.M.R. ch. 856, §6(D) have been met for all wastewater treatment units which are unlicensed under the terms of that provision. I am aware there are significant penalties for submitting false information including the possibility of fine and imprisonment.
NOTE: Generators should consult with compactor manufacturers to determine if their particular waste can be safely compacted. The requirements of 06-096 C.M.R. ch. 851 and 06-096 C.M.R. ch. 852 apply to compactors and the compacted waste including the labeling, maximum accumulation time, inspection, land disposal restriction and closure provisions.
NOTE: Generators need to ensure that their waste is only hazardous for corrosivity and not for other hazardous waste characteristics, such as toxicity (including metals), ignitability, or reactivity.
06-096 C.M.R. ch. 856, § 6