05-071-61 Me. Code R. § 3

Current through 2024-44, October 30, 2024
Section 071-61-3 - RATING SYSTEM
1. The rating system set forth in subsections 5 and 6 of this section and the "hold harmless" provision shall be used to rate each Major Capital School Construction project application when it is applicable. "Hold harmless" means the rating points assigned to a project application that relate directly to health, safety and energy efficiency as outlined in Priority A may not be reduced by health and safety, and energy efficiency improvements made to existing buildings. This "hold harmless" provision will only apply if the project received a rating on the previous school facilities Proposed Priority List.
2. In order to be visited and rated by the Facilities Team, the application must be complete and for a public school that is currently housing students or has been officially condemned pursuant to Title 20-A M.R.S.A. § 4 102(2) within the last school year.
3. The Facilities Team will score each eligible project following submission of the application by the SAU and an on-site visit by the evaluators. Once all visits have been completed, a proposed priority list will be developed based upon the scores assigned to each school. The assigned scores will change only if required by a review committee's decision pursuant to Section 4, subsection 3 of this Chapter.

The SAU is responsible for notifying the Facilities Team of any changes in local conditions prior to the release of the Department's final recommended Priority List.

4. The rating system is based on a total of 200 points for State Board priorities as follows:

PRIORITY A: Buildings and Grounds - 90 points total

PRIORITY B: School Population - 45 points total

PRIORITY C: Program and Planning - 65 points total

5.The Rating System: Criteria and Point Assignment

PRIORITY A: Buildings and Grounds (Total 90 Points)

Criteria - Unsafe Conditions (Total of 55 Points)

Group 1: Building (maximum 40 points)

1. Building classification
2. Structure
3. Combustible
4. Access and egress
5. Boiler room
6. Electrical
7. Storage
8. Stairwells
9. Environmental hazards
10. Security

Group 2: Site (maximum 15 points)

11. Traffic/Circulation
12. Sewerage system
13. Environmental conditions
14. Water quality and quantity
15. Physical education and play areas

Criteria - Obsolete, Inefficient and/or Unsuitable (Total 35 Points)

Group 1: Program Related Facility Deficiencies and Inefficiencies (maximum 20 points)

16. Special areas - non-instructional
17. Special areas - instructional
18. Room size and arrangement
19. Effective program
20. Site size and location
21. Handicapped accessibility

Group 2: Mechanical and Building Systems Deficiencies (maximum 15 points)

22. Building Envelope
23. Heating
24. Ventilation
25. Plumbing
26. Electrical

PRIORITY B: School Population (Total of 45 Points)

Criteria - Overcrowding (Total of 27 points)

Group 1: Instructional Areas (maximum 14 points)

27. General classroom areas
28. Special areas

Group 2: Program Scheduling (maximum 13 points)

29. Extended school day
30. Student release: overcrowding
31. Classes scheduled in unsuitable areas
32. Scheduling in temporary facilities due to overcrowding

Criteria - Enrollment Estimates and Population Shifts (Total of 18 points)

Group 1: Enrollment Estimates (maximum 10 points)

33. Estimates based on enrollment projections

Group 2: Population Shifts and Other (maximum 8 points)

34. Unusual changes

PRIORITY C: Program and Planning (Total of 65 Points)

35. Career Preparation/Guidance
36. English/Language Arts
37. Health and Physical Education
38. Mathematics
39. World Languages
40. Science
41. Technology/Distance Learning
42. Social Studies
43. Visual and Performing Arts
44. Library/Media
45. Special Ed/Gifted & Talented/Alternative Education
46. Early Childhood

For both CTE Regions and Centers an individual rating will be done based upon CTE programs offered by the Region or Center. The individual ratings will also take account of programs the Region or Center seeks to offer but is unable to offer because of facility restraints.

6. The following steps shall be used by the Facilities Team to break ties that occur during the rating process for the purpose of placing the projects on the Priority List:
A. The project with more points in Priority A: Buildings and Grounds shall be placed first.
B. If a tie still exists, the project benefiting the larger number of students shall be placed first.

05-071 C.M.R. ch. 61, § 3