When the Chief Inspector issues an order of correction to an owner stating that a boiler or pressure vessel requires repair, the owner must submit satisfactory written evidence that the repairs have been completed by the time specified. The Chief Inspector must not issue a new inspection certificate for a boiler or pressure vessel that requires repair.
02-041 C.M.R. ch. 21, § 3