La. Admin. Code tit. 56 § III-2303

Current through Register Vol. 50, No. 12, December 20, 2024
Section III-2303 - Applicability
A. Any port may use the design build method, pursuant to the pilot program as specified and limited by R.S. 34:2523, on any non-architectural project where the project involves the transport, production, storage, or manufacturing of port cargos and where 60 percent or more of the construction cost estimate in the design criteria package, as determined by the port's retained design professional, consists of engineered products and components and services, fabrication, and installation for such products and components.
B. A port may utilize the design-build method on projects funded by any manner for any port project in which a notice of intent is advertised in accordance with R.S. 34:3523 prior to December 31, 2015.

La. Admin. Code tit. 56, § III-2303

Promulgated by the Department of Transportation and Development, Office of Multimodal Planning, LR 39:118 (January 2013).
AUTHORITY NOTE: Promulgated in accordance with R.S. 38:3523.