Section III-2103 - Creation of Priority Program [Formerly section 2101]A. Creation of Priority Program 1. The Louisiana Port Construction and Development Priority Program was created by Act 452 of the 1989 Regular Session. Before this program, the state funded ports projects through the Capital Outlay Program without requiring any feasibility studies. From 1977 to 1984 Louisiana expended more funds for ports than any other state in the union. For this period Louisiana spent $25,985,000 on shallow draft ports and $173,424,000 on deep draft ports for a total of $199,409,000.12. The creation of the Port Construction and Development Priority Program changed the method by which Louisiana participated in port improvements. The feasibility of proposed port projects must now be determined and the projects must be prioritized. The source of state funds for the Louisiana Port Construction and Development Priority Program is the Transportation Trust Fund. Revenue accrues to the Transportation Trust Fund through the collection of taxes placed on the sale of gasoline.3. In general, the purpose of a priority program is to disburse funds to projects that have the highest prospects of success as determined by objective standards such as technical and financial feasibility and overall impacts. A priority program also defines the standards by which these projects are evaluated and provides the mechanisms to conduct the evaluation according to an accepted methodology. Moreover, a priority program's application process may serve as a means to determine whether proposed projects are even eligible for funding under the program as well as provide the basis for maintaining a current inventory of facilities that can be used for future purposes.4. The components of a typical priority program includes legislative authorization, a set of rules and regulations governing the program's implementation, an application process, an evaluation procedure, a prioritization of projects, funding, and finally implementation.5. With regard to Louisiana's port priority program, many of the overall requirements and procedures are similar to other priority programs. However, Louisiana's program specifically emphasizes the need of equitable rationalization of state expenditures in order to avoid duplication of port infrastructure. In addition, because ports are dynamic economic entities, Louisiana's port priority program provides for rigorous analysis of forecasted project benefits in order to ensure the overall impact of the project on the state will be positive, providing maximum benefits for the state. Finally, because effective project implementation is as important to the success of the program as project prioritization, the Louisiana port priority program stipulates strict procedures for the planning and construction of funded projects as well as the operation of maintenance of the completed project.B. Port Project Evaluation Methodology 1.R.S. 34:3451 et seq., requires that the Department of Transportation and Development (department) develop procedures for review and a methodology to evaluate port projects which are seeking state funds.2. Procedures to review and evaluate port project applications for funding shall be submitted to the Joint Legislative Committee on Transportation, Highways and Public Works. Before implementing these procedures, the approval of the committee shall be obtained in accordance with the Administrative Procedure Act.3. The department may contract with the Louisiana State University National Ports and Waterways Institute for any of the duties associated with the development of the port priority program. These activities may include but are not limited to the development, review, and evaluation of plans and specifications and the development of the port program list. However, the final determination of the port priority list shall remain with the department and the Joint Legislative Committee as provided by Act 452.4. An inventory of ports, navigable waterways, and water transportation facilities shall be maintained. Both private and public facilities shall be included. Information such as location, capacities, and capabilities shall be included. The department shall also serve as a clearinghouse for inquiries for ports and waterways information.5. Each year, the department shall prepare a summary report of financial requirements for expanding or renovating existing ports and waterways facilities and constructing new ones. The financial requirements shall be separated into state, federal, local and private funds required.C. Program Procedures 1. Any port authority may submit an application for funding to the department except as provided below. Applications shall be submitted by the first of March, June, September and December of each calendar year for consideration in the following fiscal year. The application shall include a description of the project, demonstration of immediate need, preliminary design, cost estimate, and a description of the project area.2. Except as provided herein, port authorities cannot submit an application if any of the following are true. a. On the recommended construction program, the port authority has a balance of Louisiana's funding share equal to or more than the single project maximum legislative funding authority established by the department.b. The application to be submitted will cause the port authority to have a balance of Louisiana's funding share greater than the single project maximum legislative funding authority established by the department.c. The port authority has a project that may be canceled under the Section on distribution of funds.3. If a port authority or its application meets one of the aforementioned factors, it may submit an informal application by December 1 and request that it be reviewed and evaluated in the event that the department has not received sufficient project applications to meet the estimated funding level for the fiscal year. Projects submitted under this provision will receive a lesser priority than other projects on the list. If more than one port authority submits an application under this provision, then the applications that were submitted as informal with the highest evaluation scored will be recommended in their order of score until the estimated funding level has been met. The remaining applications will not be eligible for the Recommended Construction Program.4. The Louisiana Department of Transportation and Development shall review the applications. Applications shall not be subjected to a formal review and evaluation until the information required in the application has been submitted. Applications shall also be reviewed by any appropriate state agencies.5. The act provides for the submittal of a list of recommended projects in prioritized order to the Joint Legislative Committee. The committee will hold public hearings to obtain public input concerning the priority list. After the hearings and before the convening of the regular session, the department shall prepare a recommended construction program for the coming fiscal year and submit it to the joint legislative committee. When the recommended construction program is presented to the legislature for funding, the legislature cannot add any projects to the program.6. Upon funding by the legislature, the department shall enter into an agreement with the port authority to participate in the construction of the project. The port authority shall provide 10 percent local match for the cost of constructing the project, and shall furnish all lands, easements, rights-of-ways, and spoil disposal areas at no cost to the state unless said items are critical to the project. The port authority also shall operate and maintain the facility without cost to the state.7. Port authorities domiciled in a parish with a population of 50,000 or more shall be responsible for the preparation of plans and specifications, for letting of bids for construction, and for construction observation. Port authorities domiciled in a parish with a population less than 50,000 may request the department to prepare plans and specifications, to let the project for bids, and to observe construction. The engineer that prepared the plans will inspect the work and certify that the project complies with the plans and specifications upon completion. a. Applications/projects shall conform to all local ordinances and requirements for Disadvantaged Veteran-owned/Women-owned Business Enterprises (DBE) set forth by local, regional, and State political subdivisions.8. All contracts for construction shall be advertised and awarded in accordance with R.S. 38:2212 et seq.9. Projects which are funded by this program shall begin in the fiscal year that the appropriation is made. Execution of an agreement with the department and receipt of preliminary plans by the department shall indicate that the project has begun. These preliminary construction plans differ from the plans submitted in the application in that they are more advanced.D. Auditing Funds. Funds shall be audited biannually by legislative auditor or certified public accountant in accordance with R.S. 24:513(A) and distributed in accordance with R.S. 24:516(A). The audit shall include an investigation of any failure to comply with the recommendations of the department in planning, design, and construction of the port project. Port authorities shall certify annually that the funds made available have been expended according to law.E. Misuse of Funds. The legislative auditor shall report any misuse of funds to the Legislative Audit Advisory Council. The council shall determine if in fact funds have been misused. If funds have been misused, the council will instruct the state treasurer to suspend the distribution of funds. The council shall also advise the local district attorney of the misuse. The district attorney will take appropriate actions. 1Port and Waterways Institute, Louisiana Statewide Ports Assessment, 2 vols., (Baton Rouge: Louisiana State University, 1986), 11, 88.
La. Admin. Code tit. 56, § III-2103
Promulgated by the Department of Transportation and Development, Division of Flood Control and Water Management, LR 17:274 (March 1991), amended LR 18:749 (July 1992), repromulgated by the Department of Transportation and Development, Office of Public Works, LR 31:942 (April 2005), LR 34:1040 (June 2008), Amended by the Department of Transportation and Development, Office of Multimodal Commerce, LR 491433 (8/1/2023).AUTHORITY NOTE: Promulgated in accordance with R.S. 34:3451-3463.