Section III-733 - Appendix 3-Procedural SequenceA. Applicant or his Engineer submits "Letter of Intent."B. Applicant or his Engineer submits "Pre-Application for Construction of Dam."C. Applicant publishes "Notice of Application" and a "Public Hearing(s)" is (are) held.D. Applicant or his Engineer submits "Designs, Plans and Specifications" as follows and submits "Application for Construction of Dams."1. "Impact (Hazard) Classification.2. Determination of controlling design condition and associated storm runoff.3. Setting of spillway and stilling basin widths and elevations, top of embankment elevation, and normal pool stage.4. Plans, Specifications, Designs and other Submittals.E. The DOTD issues "Approval or Denial of Application"; Approval is an "Approval for Construction."F. Construction begins; Applicant or his Engineer performs "Construction Inspections."G. If "Deficiencies" are found by the DOTD, Applicant or Applicant's Engineer; then the Applicant or his Engineer shall correct the deficiencies.H. Supervision of Construction by the Owner.I. Applicant or his Engineer submits "Notice of Completion" and "As-Built Drawings" and revised "Application for construction of Dam."J. The DOTD issues "Certificate of Completion/Impoundment Permit."K. Applicant or his Engineer submits "Maintenance and Operation Procedures" for the DOTD's approval.L. Applicant or his Engineer submits "Emergency Preparedness Plan" for the DOTD's approval.La. Admin. Code tit. 56, § III-733
Promulgated by the Department of Transportation and Development, Office of Public Works, LR 22:1241 (December 1985), repromulgated by the Department of Transportation and Development, Office of Public Works, LR 31:942 (April 2005).AUTHORITY NOTE: Promulgated in accordance with R.S. 38:24.