Current through Register Vol. 50, No. 9, September 20, 2024
Section XIII-927 - Records: Pipe Design [49 CFR 192.127]A. For steel transmission pipelines installed after July 1, 2020, an operator must collect or make, and retain for the life of the pipeline, records documenting that the pipe is designed to withstand anticipated external pressures and loads in accordance with §903 and documenting that the determination of design pressure for the pipe is made in accordance with §905 [49 CFR 192.127(a)]B. For steel transmission pipelines installed on or before July 1, 2020, if operators have records documenting pipe design and the determination of design pressure in accordance with §903 and 905, operators must retain such records for the life of the pipeline. [49 CFR 192.127(b)]C. For steel transmission pipeline segments installed on or before July 1, 2020, if an operator does not have records necessary to establish the MAOP of a pipeline segment, the operator may be subject to the requirements of §2724 according to the terms of that Section. [49 CFR 192.127(c)]La. Admin. Code tit. 43, § XIII-927
Promulgated by the Department of Natural Resources, Office of Conservation, LR 461584 (11/1/2020).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.