La. Admin. Code tit. 43 § XIII-3515

Current through Register Vol. 50, No. 9, September 20, 2024
Section XIII-3515 - What must a Small LPG Operator do to Implement this Chapter? [49 CFR 192.1015]
A. General. No later than August 2, 2011 a small LPG operator must develop and implement an IM program that includes a written IM plan as specified in Subsection B of this Section. The IM program for these pipelines should reflect the relative simplicity of these types of pipelines. [49 CFR 192.1015(a)]
B. Elements. A written integrity management plan must address, at a minimum, the following elements. [ 49 CFR 192.1015(b)]
1. Knowledge. The operator must demonstrate knowledge of its pipeline, which, to the extent known, should include the approximate location and material of its pipeline. The operator must identify additional information needed and provide a plan for gaining knowledge over time through normal activities conducted on the pipeline (for example, design, construction, operations or maintenance activities). [ 49 CFR 192.1015(b)(1)]
2. Identify Threats. The operator must consider, at minimum, the following categories of threats (existing and potential): corrosion(including atmospheric corrosion), natural forces, excavation damage, other outside force damage, material or weld failure, equipment failure, and incorrect operation. [49 CFR 192.1015(b)(2)]
3. Rank Risks. The operator must evaluate the risks to its pipeline and estimate the relative importance of each identified threat. [ 49 CFR 192.1015(b)(3)]
4. Identify and Implement Measures to Mitigate Risks. The operator must determine and implement measures designed to reduce the risks from failure of its pipeline. [ 49 CFR 192.1015(b)(4)]
5. Measure Performance, Monitor Results, and Evaluate Effectiveness. The operator must monitor, as a performance measure, the number of leaks eliminated or repaired on its pipeline and their causes. [ 49 CFR 192.1015(b)(5)]
6. Periodic Evaluation and Improvement. The operator must determine the appropriate period for conducting IM program evaluations based on the complexity of its pipeline and changes in factors affecting the risk of failure. An operator must re-evaluate its entire program at least every five years. The operator must consider the results of the performance monitoring in these evaluations. [ 49 CFR 192.1015(b)(6)]
C. Records. The operator must maintain, for a period of at least 10 years, the following records: [ 49 CFR 192.1015(c)]
1. a written IM plan in accordance with this Section, including superseded IM plans; [ 49 CFR 192.1015(c)(1)]
2. documents supporting threat identification; and [ 49 CFR 192.1015(c)(2)]
3. documents showing the location and material of all piping and appurtenances that are installed after the effective date of the operator's IM program and, to the extent known, the location and material of all pipe and appurtenances that were existing on the effective date of the operator's program. [ 49 CFR 192.1015(c)(3)]

La. Admin. Code tit. 43, § XIII-3515

Promulgated by the Department of Natural Resources, Office of Conservation, LR 38:124 (January 2012), Amended LR 471147 (8/1/2021), Amended LR 491110 (6/1/2023).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.