Section XIII-3331 - How may confirmatory direct assessment (CDA) be used? [49 CFR 192.931]A. An operator using the confirmatory direct assessment (CDA) method as allowed in §3337 must have a plan that meets the requirements of this Section and of §3325(ECDA) and §3327(ICDA) [ 49 CFR 192.931] 1. Threats. An operator may only use CDA on a covered segment to identify damage resulting from external corrosion or internal corrosion. [ 49 CFR 192.931(a)]2. External Corrosion Plan. An operator's CDA plan for identifying external corrosion must comply with §3325 with the following exceptions. [ 49 CFR 192.931(b)] a. The procedures for indirect examination may allow use of only one indirect examination tool suitable for the application. [ 49 CFR 192.931(b)(1)]b. The procedures for direct examination and remediation must provide that: [ 49 CFR 192.931(b)(2)] (i) all immediate action indications must be excavated for each ECDA region; and [ 49 CFR 192.931(b)(2)(i)](ii) at least one high risk indication that meets the criteria of scheduled action must be excavated in each ECDA region. [ 49 CFR 192.931(b)(2)(ii) ]3. Internal Corrosion Plan. An operator's CDA plan for identifying internal corrosion must comply with §3327 except that the plan's procedures for identifying locations for excavation may require excavation of only one high risk location in each ICDA region. [ 49 CFR 192.931(c)]4. Defects Requiring Near-Term Remediation. If an assessment carried out under Paragraphs 2 or 3 of this Section reveals any defect requiring remediation prior to the next scheduled assessment, the operator must schedule the next assessment in accordance with NACE SP0502 (incorporated by reference, see §507), sections 6.2 If the defect requires immediate remediation, then the operator must reduce pressure consistent with §3333 until the operator has completed reassessment using one of the assessment techniques allowed in §3337 [ 49 CFR 192.931(d)] La. Admin. Code tit. 43, § XIII-3331
Promulgated by the Department of Natural Resources, Office of Conservation, Pipeline Division, LR 30:1281 (June 2004), amended by the Department of Natural Resources, Office of Conservation, LR 38:122 (January 2012), Amended LR 441043 (6/1/2018).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.