La. Admin. Code tit. 43 § XIII-2505

Current through Register Vol. 50, No. 9, September 20, 2024
Section XIII-2505 - Uprating to a Pressure That Will Produce a Hoop Stress of 30 Percent or More of SMYS in Steel Pipelines [49 CFR 192.555]
A. Unless the requirements of this Section have been met, no person may subject any segment of a steel pipeline to an operating pressure that will produce a hoop stress of 30 percent or more of SMYS and that is above the established maximum allowable operating pressure. [ 49 CFR 192.555(a)]
B. Before increasing operating pressure above the previously established maximum allowable operating pressure the operator shall: [ 49 CFR 192.555(b)]
1. review the design, operating, and maintenance history and previous testing of the segment of pipeline and determine whether the proposed increase is safe and consistent with the requirements of this Subpart; and [ 49 CFR 192.555(b)(1)]
2. make any repairs, replacements, or alterations in the segment of pipeline that are necessary for safe operation at the increased pressure. [ 49 CFR 192.555(b)(2) ]
C. After complying with Subsection B of this Section, an operator may increase the maximum allowable operating pressure of a segment of pipeline constructed before September 12, 1970, to the highest pressure that is permitted under §2719, using as test pressure the highest pressure to which the segment of pipeline was previously subjected (either in a strength test or in actual operation). [ 49 CFR 192.555(c)]
D. After complying with Subsection B of this Section, an operator that does not qualify under Subsection C of this Section may increase the previously established maximum allowable operating pressure if at least one of the following requirements is met. [ 49 CFR 192.555(d)]
1. The segment of pipeline is successfully tested in accordance with the requirements of this Subpart for a new line of the same material in the same location. [ 49 CFR 192.555(d)(1)]
2. An increased maximum allowable operating pressure may be established for a segment of pipeline in a Class 1 location if the line has not previously been tested, and if: [ 49 CFR 192.555(d)(2)]
a. it is impractical to test it in accordance with the requirements of this Subpart; [ 49 CFR 192.555(d)(2)(i)]
b. the new maximum operating pressure does not exceed 80 percent of that allowed for a new line of the same design in the same location; and [ 49 CFR 192.555(d)(2)(ii) ]
c. the operator determines that the new maximum allowable operating pressure is consistent with the condition of the segment of pipeline and the design requirements of this Subpart. [ 49 CFR 192.555(d)(2)(iii) ]
E. Where a segment of pipeline is uprated in accordance with Subsection C or Paragraph D.2 of this Section, the increase in pressure must be made in increments that are equal to: [ 49 CFR 192.555(e)]
1. 10 percent of the pressure before the uprating; or [ 49 CFR 192.555(e)(1)]
2. 25 percent of the total pressure increase, whichever produces the fewer number of increments. [ 49 CFR 192.555(e)(2)]

La. Admin. Code tit. 43, § XIII-2505

Promulgated by the Department of Natural Resources, Office of Conservation, LR 9:239 (April 1983), amended LR 10:531 (July 1984), LR 20:446 (April 1994), LR 30:1258 (June 2004).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:501 et seq.