Current through Register Vol. 50, No. 11, November 20, 2024
Section XI-1559 - Construction RecordsA. A complete record that shows the following must be maintained by the operator involved for the life of each pipeline facility: 1. the total number of girth welds and the number nondestructively tested, including the number rejected and the disposition of each rejected weld;2. the amount, location and cover of each size of pipe installed;3. the location of each crossing of another pipeline;4. the location of each buried utility crossing;5. the location of each overhead crossing;6. the location of each valve, weighted pipe, corrosion test station, or other item connected to the pipe.La. Admin. Code tit. 43, § XI-1559
Promulgated by the Department of Natural Resources, Office of Conservation, LR 12:115 (February 1986).AUTHORITY NOTE: Promulgated in accordance with R.S. 30:4(C)(17).