La. Admin. Code tit. 43 § I-1116

Current through Register Vol. 50, No. 9, September 20, 2024
Section I-1116 - Alternative Energy Source Project Design Safeguards
A. The lessee or operator shall design its AESP and conduct all activities in a manner that ensures safety and which will not cause undue harm or damage to any structures and/or natural resources, physical, atmospheric, and biological components, including, but not limited to, those owned by the state, Port Authority, Political Subdivision, or Levee District.
B. The lessee and/or operator shall compile, retain, and make available to the board, DOTD, affected Port Authority, and Levee District, or its authorized representative, within the time specified by the board, any data or information related to the site assessment, design, or operations of the alternative energy source.

La. Admin. Code tit. 43, § I-1116

Promulgated by Department of Natural Resources, Office of Mineral Resources, LR 38:128 (January 2012).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:124.