La. Admin. Code tit. 33 § V-4476

Current through Register Vol. 50, No. 6, June 20, 2024
Section V-4476 - Design and Operating Requirements
A. The owner or operator of each new waste pile on which construction commences after January 29, 1992, each lateral expansion of a waste pile unit on which construction commences after July 29, 1992, and each such replacement of an existing waste pile unit that is to commence reuse after July 29, 1992, must install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal systems, in accordance with LAC 33:V.2303.C, unless exempted under LAC 33:V.2303.D-F, and must comply with the procedures of LAC 33:V.4462.B. Construction commences is as defined in LAC 33:V.109.Existing Facilities.

La. Admin. Code tit. 33, § V-4476

Promulgated by the Department of Environmental Quality, Office of Solid and Hazardous Waste, Hazardous Waste Division, LR 16:220 (March 1990), amended LR 21:266 (March 1995).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2180 et seq.