La. Admin. Code tit. 33 § V-4405

Current through Register Vol. 50, No. 6, June 20, 2024
Section V-4405 - Cost Estimate for Post-Closure Care
A. The owner or operator of a hazardous waste disposal unit must have a detailed written estimate, in current dollars, of the annual cost of post-closure monitoring and maintenance of the facility in accordance with the applicable post-closure regulations in LAC 33:V.4389-4395, LAC 33:V.4457, 4475, 4489, and 4501.
1. The post-closure cost estimate must be based on the costs to the owner or operator of hiring a third party to conduct post-closure care activities. A third party is a party who is neither a parent nor subsidiary of the owner or operator. (See definition of parent corporation in LAC 33:V.4399.)
2. The post-closure cost estimate is calculated by multiplying the annual post-closure cost estimate by the number of years of post-closure care required under LAC 33:V.4389.
B. During the active life of the facility, the owner or operator must adjust the post-closure cost estimate for inflation within 60 days prior to the anniversary date of the establishment of the financial instrument(s) used to comply with LAC 33:V.4407. For owners or operators using the financial test or corporate guarantee, the post-closure care cost estimate must be updated for inflation no later than 30 days after the close of the firm's fiscal year and before submission of updated information to the administrative authority as specified in LAC 33:V.4407.D.5. The adjustment may be made by recalculating the post-closure cost estimate in current dollars or by using an inflation factor derived from the most recent Implicit Price Deflator for Gross National Product published by the U.S. Department of Commerce in its Survey of Current Business as specified in LAC 33:V.4405.B.1 and 2. The inflation factor is the result of dividing the latest published annual deflator by the deflator for the previous year.
1. The first adjustment is made by multiplying the latest adjusted post-closure cost estimate by the inflator factor. The result is the adjusted post-closure cost estimate.
2. Subsequent adjustments are made by multiplying the latest adjusted post-closure cost estimate by the latest inflation factor.
C. During the active life of the facility, the owner or operator must revise the post-closure cost estimate no later than 30 days after a revision to the post-closure plan which increases the cost of post-closure care. If the owner or operator has an approved post-closure plan, the post-closure cost estimate must be revised no later than 30 days after the administrative authority has approved the request to modify the plan, if the change in the post-closure plan increases the cost of post-closure care. The revised post-closure cost estimate must be adjusted for inflation as specified in LAC 33:V.4405.B.
D. The owner or operator must keep the following at the facility during the operating life of the facility: the latest post-closure cost estimate prepared in accordance with LAC 33:V.4405.A and C and, when this estimate has been adjusted in accordance with LAC 33:V.4405.B, the latest adjusted post-closure cost estimate.

La. Admin. Code tit. 33, § V-4405

Promulgated by the Department of Environmental Quality, Office of Solid and Hazardous Waste, Hazardous Waste Division, LR 10:200 (March 1984), amended LR 13:433 (August 1987), LR 18:723 (July 1992).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2180 et seq.