La. Admin. Code tit. 33 § V-2719

Current through Register Vol. 50, No. 6, June 20, 2024
Section V-2719 - Closure and Post-Closure Care
A. During the closure period, the owner or operator must:
1. continue all operations (including pH control) necessary to maximize degradation, transformation, or immobilization of hazardous constituents within the treatment zone as required under LAC 33:V.2703.A, except to the extent such measures are inconsistent with LAC 33:V.2719.A.8;
2. continue all operations in the treatment zone to minimize run-off of hazardous constituents as required under LAC 33:V.2703.B;
3. maintain the run-on control system required under LAC 33:V.2703.C;
4. maintain the run-off management system required under LAC 33:V.2703.D;
5. control wind dispersal of particulate matter if required under LAC 33:V.2703.F;
6. continue to comply with any prohibitions or conditions concerning growth of food-chain crops under LAC 33:V.2709;
7. continue unsaturated zone monitoring in compliance with LAC 33:V.2711, except that soil-pore liquid monitoring may be terminated 90 days after the last application of waste to the treatment zone; and
8. establish a vegetative cover on the portion of the facility being closed at such time that the cover will not substantially impede degradation, transformation, or immobilization of hazardous constituents in the treatment zone. The vegetative cover must be capable of maintaining growth without extensive maintenance.
B. For the purpose of complying with LAC 33:V.3517, when closure is completed, the owner or operator may submit to the Office of Environmental Services certification by an independent, qualified soil scientist, in lieu of an independent, qualified professional engineer, that the facility has been closed in accordance with the specifications in the approved closure plan.
C. During the post-closure care period, the owner or operator must:
1. continue all operations (including pH control) necessary to enhance degradation and transformation and sustain immobilization of hazardous constituents in the treatment zone to the extent that such measures are consistent with other post-closure care activities;
2. maintain a vegetative cover over closed portions of the facility;
3. maintain the run-on control system required under LAC 33:V.2703.C.;
4. maintain the run-off management system required under LAC 33:V.2703.D;
5. control wind dispersal of particulate matter if required under LAC 33:V.2703.F;
6. continue to comply with any prohibitions or conditions concerning growth of food-chain crops under LAC 33:V.2709; and
7. continue unsaturated zone monitoring in compliance with LAC 33:V.2711, except that soil-pore liquid monitoring may be terminated 90 days after the last application of waste to the treatment zone.
D. The owner or operator is not subject to regulation under Paragraph A.8 and Subsection C of this Section if the administrative authority finds that the level of hazardous constituents in the treatment zone soil does not exceed the background value of those constituents by an amount that is statistically significant when using the test specified in Paragraph D.3 of this Section. The owner or operator may submit such a demonstration to the Office of Environmental Services at any time during the closure or post-closure care periods. For the purposes of this Subsection:
1. the owner or operator must establish background soil values and determine whether there is a statistically significant increase over those values for all hazardous constituents specified in the facility permit under LAC 33:V.2705.B:
a. background soil values may be based on a one-time sampling of a background plot having characteristics similar to those of the treatment zone;
b. the owner or operator must express background values and values for hazardous constituents in the treatment zone in a form necessary for the determination of statistically significant increases under LAC 33:V.2719.D.3;
2. in taking samples used in the determination of background and treatment zone values, the owner or operator must take samples at a sufficient number of sampling points and at appropriate locations and depths to yield samples that represent the chemical makeup of soil that has not been affected by leakage from the treatment zone and the soil within the treatment zone, respectively;
3. in determining whether a statistically significant increase has occurred, the owner or operator must compare the value of each constituent in the treatment zone to the background value for that constituent using a statistical procedure that provides reasonable confidence that the constituent presence in the treatment zone will be identified. The owner or operator must use a statistical procedure that:
a. is appropriate for the distribution of the data used to establish background values; and
b. provides a reasonable balance between the probability of falsely identifying a hazardous constituent presence in the treatment zone and the probability of failing to identify a real presence in the treatment zone;
4. the owner or operator is not subject to regulation under LAC 33:V.Chapter 33 if the administrative authority finds that the owner or operator satisfies LAC 33:V.2719.D and if unsaturated zone monitoring under LAC 33:V.2711 indicates that hazardous constituents have not migrated beyond the treatment zone during the active life of the land treatment unit.

La. Admin. Code tit. 33, § V-2719

Promulgated by the Department of Environmental Quality, Office of Solid and Hazardous Waste, Hazardous Waste Division, LR 10:200 (March 1984), amended LR 14:790 (November 1988), amended by the Office of Environmental Assessment, Environmental Planning Division, LR 26:2482 (November 2000), amended by the Office of the Secretary, Legal Affairs Division, LR 31:2461 (October 2005), LR 33:2112 (October 2007), LR 34:999 (June 2008).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2180 et seq.