La. Admin. Code tit. 33 § V-30304

Current through Register Vol. 50, No. 9, September 20, 2024
Section V-30304 - Test Pressure [49 CFR 195.304]
A. The test pressure for each pressure test conducted under this Chapter must be maintained throughout the part of the system being tested for at least four continuous hours at a pressure equal to 125 percent, or more, of the maximum operating pressure and, in the case of a pipeline that is not visually inspected for leakage during the test, for at least an additional four continuous hours at a pressure equal to 110 percent, or more, of the maximum operating pressure. [ 49 CFR 195.304]

La. Admin. Code tit. 33, § V-30304

Promulgated by the Department of Natural Resources, Office of Conservation, Pipeline Division, LR 29:2822 (December 2003).
AUTHORITY NOTE: Promulgated in accordance with R.S.30:703