La. Admin. Code tit. 33 § III-211

Current through Register Vol. 50, No. 8, August 20, 2024
Section III-211 - Methodology
A. Formula to Apportion Fees

Air Toxics Permits Application Fee for major sources of toxic pollutants (based on type of facility and on rated production capacity/throughput)

Surcharge of 10% of the permit application fee to be charged when there is an increase in toxic air pollutant emissions above the Minimum Emission Rates (MER) listed in LAC 33:III.5112, Table 51.1

Air Toxics Annual Emissions Fee for major sources of toxic air pollutants (based on air toxic pollutants emitted)1

Variable

Annual Maintenance Fee (based on type of facility and on rated production capacity/throughput)

Variable

New Application Fee (based on type of facility and on rated production capacity/throughput)

Variable

Major and Minor Modification Modified Permit Fee (based on type of facility and on rated production capacity/throughput)

Variable

PSD Application Fee (based on type of facility and on rated production capacity/throughput)

Surcharge of 50% of the application fee when a PSD permit application is being processed

"NESHAP" Maintenance Fee (based on type of facility and on rated production capacity/throughput)

Surcharge of 25% of the Annual Maintenance Fee for that particular process/plant to be added to the Annual Maintenance Fee

"NSPS" Maintenance Fee (based on type of facility and on rated production capacity/throughput)

Surcharge of 25% of the permit application fee to be charged for any permit application that includes the addition of new equipment subject to NSPS regulation

1 Fees shall be assessed on major sources as defined in LAC 33:III.5103. Sources that have reduced emissions below major source thresholds are not required to submit annual emissions reports in accordance with LAC 33:III.5107.

B. Fee Methodology
1. All fees required by this Chapter are listed in LAC 33:III.223, Fee Schedule Listing, which shall be referred to as the Fee Schedule in the remainder of this Chapter. All persons required to obtain a new or modified permit shall be subject to a permit application fee (see Fee Schedule) unless otherwise exempted. This fee shall be submitted with any application for a new or modified permit. The annual maintenance fee for a new or modified source shall be paid during the fiscal year (July 1 to June 30) in which the process specified in the permit comes on line.
2. The Standard Industrial Classification (SIC) codes listed in the Fee Schedule shall be used to assist in the determination of the proper fees to assess.
3. The permit fee for sources or facilities with multiple processes shall be equal to the total amounts required by the individual processes involved, as listed in the Fee Schedule, unless the entire facility is covered by a single fee category.
4. All invoices for annual maintenance fees for major sources shall be submitted to those sources during the fiscal year. The annual maintenance fee shall be applicable to the fiscal year beginning July 1 of each year and ending the following June 30. Failure to remit the annual maintenance fee in accordance with the above shall be considered grounds for revoking an existing permit. Maintenance fees not received for prior fiscal years are due upon receipt of new or duplicate invoices. Minor sources may or may not receive an annual compliance inspection. In this case the maintenance fee must be paid within 30 days after notification by the agency of the amount due. Only one such fee shall be charged annually.
5. If a conditional permit is issued in accordance with adopted procedures, fees submitted with that application for permit shall be retained and be applicable to the regular permit when it is acted upon.
6. If a process is not listed in the fee schedule and is not a source type exempted from fees by this regulation, then the department shall assign a fee using the negotiated fee set forth in fee number 1710 or 1712, as applicable. If a process or facility is specifically listed in the fee schedule, then fee number 1710 or 1712 cannot be utilized.
7. Annually, the department shall reevaluate the Fee Schedule based upon the previous fiscal year's reasonable costs involved in the operation of the permit system and submit such revised schedule to the secretary for approval.
8. When a company withdraws its application and claims refund for the permit fee, no refund shall be made if the review of the application is essentially completed at the time of withdrawal. However, up to 50 percent refund may be made when the review has been initiated, but is not essentially completed.
9. Annual maintenance fees (AMF) are not prorated. If a facility operates any part of a year or at a reduced rate during the year, the full annual maintenance fee is still charged. In order for the annual maintenance fee to be cancelled, the facility must not operate at all during the year and the permit to operate for the facility must be cancelled and/or changes must be made to the process or facility in order to make the process or facility not subject to regulation by the department. The cancellation of the permit shall require that a new permit be issued before the facility could be operated again. Failure to pay the annual maintenance fee will cause the permit for the facility covered by the fee to be cancelled.
10. When a permanent shutdown occurs and a company properly notifies the Office of Environmental Services by official change in the Emission Inventory Questionnaire (EIQ) and permit, then the maintenance fee would be dropped for that shutdown portion of the process/plant. This fee reduction or cancellation shall apply only in the fiscal years in which the shutdown portion of the plant or process did not operate at all. The EIQ and permit shall also need to be changed to delete the emissions from the shutdown portion of the plant or process before the start of the fiscal year in which the fee would have been charged.
11. Reserved.
12. NSPS fees may be waived when a PSD application fee is imposed.
13. The department shall determine the type of fee. This determination shall be based on the work load created by the permit application and shall be determined based on the factors described as follows.
a. New Application Fee. The new application fee shall be based on the new capacity when a new process or operation is added or the incremental increase in capacity when the capacity is increased by more than 80 percent. It applies when:
i. a new facility is added;
ii. a new operation in an existing facility is added; or
iii. an existing operation is expanded by more than 80 percent in capacity.
b. Major Modification Fee. The major modification fee shall be based on the existing capacity when the capacity is increased by more than 40 percent and less than 80 percent. The applicant has the option to choose to base the major modification fee on the incremental capacity increase and using the new permit application rate in cases where the incremental increase is small compared to the existing capacity. In that case, the applicant can choose the smaller fee as long as it is larger than the minimum major modification fee listed for the category. In all cases, the minimum amount of the fee would be equal to or greater than the minimum major modification fee for the category. The major modification fee applies when:
i. the modification will trigger PSD review;
ii. the modification would have triggered PSD review without the use of contemporaneous emission reductions or banked emissions;
iii. the modification will increase emissions by 25 tons/year or more of nonattainment pollutant;
iv. the modification will change emissions over 100 tons/year of a criteria pollutant for which the standard has been attained; or
v. the modification will increase capacity of an existing operation at least by 40 percent and less than 80 percent.
c. Minor Modification Fee. The minor modification fee (based on existing capacity) applies when a modification is not qualified under new application fee or major modification fee. The minor modification fee shall be based on the existing capacity when the capacity is increased by less than 40 percent. The applicant has the option to choose to base the minor modification fee on the incremental capacity increase and using the new permit application rate in cases where the incremental increase is small compared to the existing capacity. In that case, the applicant can choose the smaller fee as long as it is larger than the minimum minor modification fee listed for the category. In all cases, the minimum amount of the fee would be equal to or greater than the minimum minor modification fee for the category.
d. If a permit modification is such that it does not increase capacity and changes emissions by less than 25 tons/year of all nonattainment pollutants, by less than 10 tons/year of an individual toxic air pollutant, by less than 25 tons/year of total toxic air pollutants, and by less than 100 tons/year of all other criteria (attainment) pollutants, then the permit fee shall be charged equal to the minimum minor modification permit fee for each fee process category involved. If no minimum minor modification permit fee is listed in LAC 33:III.223, then the minimum minor modification fee is calculated as follows:
i. if the minor modification fee is greater than $2,000, then the minimum minor modification fee is equal to 25 percent of the minor modification fee; and
ii. if the minor modification fee is $500 to $2,000, then the minimum minor modification fee is $500.
e. Small Source Permit. The small source permit, as defined by LAC 33:III.503.B.2, applies when a permitted source is not a Part 70 source as defined in LAC 33:III.502. The permitted source must also emit or have the potential to emit less than 25 tons/year of any criteria pollutant, and less than 10 tons per year of any toxic air pollutant. For permit applications with processes specifically listed in the fee schedule that would also qualify for the small source permit fee, the permit fee shall be the lesser of these listed fees.
14. Air Toxics Annual Emissions Fees based on actual annual emissions that occurred during the previous calendar year shall be assessed on major sources as defined in LAC 33:III.5103.
15. For permits issued under LAC 33:III.507 (title V permits), the following applies:
a. no application fee shall be charged for the initial permit provided no modifications are being made at the facility; and
b. the application fee for renewals of permits where no modifications are being made at the facility shall be the minimum minor modification fee as listed in LAC 33:III.223, or where no such fee is listed in the fee schedule, as calculated in accordance with Subparagraph B.13.d of this Section.

La. Admin. Code tit. 33, § III-211

Promulgated by the Department of Environmental Quality, Office of Air Quality and Nuclear Energy, Air Quality Division, LR 13:741 (December 1987), amended LR 14:611 (September 1988), amended by the Office of Air Quality and Radiation Protection, Air Quality Division, LR 17:1205 (December 1991), LR 18:706 (July 1992), LR 19:1419 (November 1993), amended by the Office of Management and Finance, Fiscal Services Division, LR 22:17 (January 1996), amended by the Office of Environmental Assessment, Environmental Planning Division, LR 26:264 (February 2000), LR 26:2444 (November 2000), LR 29:2776 (December 2003), amended by the Office of the Secretary, Legal Affairs Division, LR 31:2435 (October 2005), LR 33:2082 (October 2007), LR 33:2620 (December 2007), LR 37:1145 (April 2011), Amended by the Office of the Secretary, Legal Division, LR 43935 (5/1/2017), Amended by the Office of the Secretary, Legal Affairs and Criminal Investigations Division, LR 441238 (7/1/2018).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2054.