La. Admin. Code tit. 33 § III-1331

Current through Register Vol. 50, No. 6, June 20, 2024
Section III-1331 - Best Management Practices (BMP) Plans
A. Facilities that decide to use a BMP plan to comply with this Subchapter shall comply with all the requirements of this Section.
B. A complete copy of the BMP plan shall be kept at the facility and be made available to authorized representatives of the department upon request. Plans need not be submitted to the department unless requested by an authorized representative of the department.
C. Each facility shall have a designated person who is accountable for the implementation and effectiveness of the BMP plan.
D. Amendment of BMP Plan
1. After review of the plan, the department may require the owner/operator of the facility to amend the plan if the plan does not prevent nuisances and/or adverse off-site impacts.
2. The plan shall be amended whenever physical or operational modification of the facility renders the existing plan inadequate. The amendment shall be implemented prior to or concurrent with the facility modification.
E. Periodic Review of BMP Plan. The owner/operator of a facility shall review the plan every three years to determine if the plan adequately reduces nuisances and adverse off-site impacts. If it is determined that the plan is not adequate, the plan shall be amended within 90 days of the review to include more effective emission prevention and control technology.
F. Contents of BMP Plan. The BMP plan shall be prepared in accordance with sound engineering practices and must be site-specific. The plan information shall be presented in the following sequence:
1. the name, mailing address, and location of the facility;
2. the name of the operator of the facility;
3. the date and year of initial facility operation;
4. a description of the facility, including an indication of any nearby recreational areas, residences, or other structures not owned or used solely by the facility, and their distances and directions from the facility;
5. a description of any nearby waters of the state that may be affected, their distances and directions from the facility, and how emissions to those waters will be prevented or minimized;
6. a statement of the facility's procedures for preventing nuisances and/or adverse off-site impacts, including a description of any emission control equipment;
7. a statement of the facility's capability and procedures for taking corrective actions and/or countermeasures when nuisances and/or adverse off-site impacts occur;
8. written procedures for self-monitoring and self-inspection of the facility;
9. personnel training records as required by this Subchapter; and
10. signatures of responsible officials.
G. Provisions for personnel training shall be included in the BMP plan as follows.
1. Any employee and/or contractor conducting abrasive blasting shall be trained on proper abrasive blasting methods, proper handling of abrasive and spent material and floatable solids, the facility's plan, and good housekeeping practices for the facility.
2. Employees and contractors shall receive training pertaining to the plan at least once a year or when significant changes are made to the plan that affect their activities.
3. Employees, contractors, and customer representatives shall be instructed not to dispose of abrasive, spent, or floatable materials to air and water bodies or to drains, drainage channels, or trenches that lead to water bodies.
4. Contractors shall be notified of and required to perform in accordance with the provisions of the plan applicable to activities related to their contract.
H. Inspections and Records
1. The BMP plan shall be reviewed every three years to ensure that the plan meets the requirements of this Subchapter. Records of this review shall be signed or initialed by the person conducting the review, and an appropriate supervisor or the facility designee, and shall be retained for a minimum of three years.
2. In addition to other recordkeeping and reporting requirements of this Section, the following records should be maintained on the facility premises:
a. self-inspection reports prepared in accordance with Paragraph F.8 of this Section;
b. documentation of employee and contractor training, including dates, subjects, and hours of training and a list of attendees with signatures.
I. Verification by the Department. Facilities to which this Subchapter applies may be inspected by an authorized representative of the department to ensure implementation and adequacy of the facility's BMP plan.

La. Admin. Code tit. 33, § III-1331

Promulgated by the Department of Environmental Quality, Office of the Secretary, Legal Affairs Division, LR 33:823 (May 2007).
AUTHORITY NOTE: Promulgated in accordance with R.S. 30:2054(B)(1).