Kan. Admin. Regs. § 82-12-7

Current through Register Vol. 43, No. 24, June 13, 2024
Section 82-12-7 - Utility requirements for telecommunication supply lines

A utility may proceed with construction of any telecommunication supply line if both of the following requirements are met:

(a) Before beginning construction, the utility shall give written notice to all of the following entities that have facilities within 1/2 mile of any contemplated telecommunication supply line construction or change in construction:
(1) Railroads; and
(2) any other utilities, unless the utilities have executed a joint use or other agreement covering the area in which the construction is proposed.
(b) The proposed telecommunication supply line construction shall meet the following requirements:
(1) Be within the utility's certified area; and
(2) not result in any objection from other utilities or railroads that have been given written notice as required by subsection (a).

Kan. Admin. Regs. § 82-12-7

Authorized by and implementing K.S.A. 66-183; effective Aug. 11, 1995; amended Aug. 5, 2011.