Kan. Admin. Regs. § 5-9-7

Current through Register Vol. 44, No. 2, January 9, 2025
Section 5-9-7 - Extension of time

For good cause shown by the applicant the chief engineer may grant an extension of time to continue the use of water under a temporary permit beyond the date authorized as shown in the approval of the application. The term of a temporary permit shall not exceed six (6) months including any authorized extension of time thereof.

Kan. Admin. Regs. § 5-9-7

Authorized by K.S.A. 82a-727; effective May 1, 1979.