Current through Register Vol. 44, No. 2, January 9, 2025
Section 5-43-4 - Sand dredging; operations conflictingIf more than one operator proposes to operate within a given reach of a private stream, then all conflicting applicants shall be required to submit proof of easements or other legal authority to operate. If more than one operator proposes to operate within a given reach of a navigable stream, the chief engineer shall determine which operators shall be permitted, based on the following criteria:
(a) The capability of the applicant's equipment to operate within the desired area; (b) the applicant's need for the material; (c) the applicant's existing operation, if any; (d) the anticipated date the applicant will begin operation; (e) the applicant's history of operation; (f) the anticipated plant completion date; (g) proof of the applicant's easements and right-of-ways necessary to operate; (h) date of application; and (i) any other relevant factor. Kan. Admin. Regs. § 5-43-4
Authorized by K.S.A. 82a-303a; implementing K.S.A 82a-302; effective May 1, 1987.