Section 5-13-10 - Time to construct the diversion works for a sand and gravel pit operation(a) As used in this regulation, "completion of diversion works" means that both of the following have occurred: (1) All equipment necessary to begin to operate a sand and gravel operation, including the hydraulic dredge, has been installed. (2) Sufficient overburden has been excavated to begin to expose the groundwater to evaporation. (b) A reasonable time to construct the diversion works for a sand and gravel pit operation shall be not less than one full year following the approval of the application to appropriate water. (c) For good cause shown by the applicant, a reasonable extension of time to construct the diversion works shall be allowed by the chief engineer if both of the following conditions are met: (1) The request for extension is filed pursuant to the requirements of K.A.R. 5-3-7. (2) The request for extension is accompanied by the statutorily required filing fee. Kan. Admin. Regs. § 5-13-10
Authorized by K.S.A. 82a-706a; implementing K.S.A. 82a-712 and 82a-713; effective Sept. 22, 2000.