Kan. Admin. Regs. § 11-4-10

Current through Register Vol. 43, No. 46, November 14, 2024
Section 11-4-10 - Notification of completion
(a) The sponsor of a construction project shall notify the commission and the chief engineer when the project is completed and ready for final certification by the chief engineer. The notification of completion shall be submitted on a form supplied by the commission and shall include the following:
(1) The date of completion of the project;
(2) an itemized list of all costs of construction, engineering, surveys, geological investigations, inspections, and land acquisition; and
(3) a request for final payment of funds for the project.
(b) The sponsor of a renovation project shall notify the commission when the project is completed. The notification of completion shall be submitted on a form supplied by the commission and shall include the following information:
(1) The date of completion of the project;
(2) an itemized list of all costs of restoration, engineering, surveys, geological investigations, inspections, and land acquisition costs;
(3) a final bathymetric survey and a determination of the final excavated volume; and
(4) a request for final payment.
(c) Final disbursement of the funds due from appropriated state funds shall be made after receipt of final certification from the chief engineer.

Kan. Admin. Regs. § 11-4-10

Authorized by K.S.A. 2005 Supp. 82a-1602 and K.S.A. 82a-1607; implementing K.S.A. 82a-1607; effective, T-86-43, Dec. 18, 1985; effective May 1, 1986; amended May 1, 1987; amended Sept. 22, 2006.