EXCEPTION: Construction which is limited to building renovations or repairs shall not be subject to inspection by the commissioner.
EXCEPTION: Construction which is limited to building renovations or repairs shall not be subject to inspection by the commissioner.
Construction Cost | Base Inspection Fee | ||
Up to $100,000 | $598 | ||
$100,001 to $1,000,000 | $645 | ||
$1,000,001 to $10,000,000 | $722 | ||
$10,000,001 and above | $783 | ||
Follow-up inspection | $214 |
The base inspection fee shall cover three inspections-a foundation, rough-in and final. The base inspection fee shall be due and payable at the time completed construction documents are submitted for review. The plan review will not be conducted until the proper base inspection fee is paid. Checks should be made payable to the Treasurer, State of Iowa, and delivered to the bureau office. This fee is separate and distinct from the plan review fee established in subrule 300.4(2).
Additional inspections may occur for any of the following reasons:
One to two hours on site = $240
Two to three hours on site = $273
Three to four hours on site = $307
Four to five hours on site = $341
Five to six hours on site = $374
Additional inspection fees will be billed to the responsible architect or building contractor on a monthly basis. The building may receive only temporary approval for occupancy if unpaid inspection fees remain at the time of final inspection.
Inspection fees and standard operating procedures for construction involving any building or facility owned by the board of regents or by any institution subject to the authority of the board of regents shall be established through a written agreement between the commissioner and the board of regents.
Exception: An employee of the department who performs inspections on behalf of the building code commissioner may perform such inspections for no more than six months prior to obtaining the required certification.
Iowa Admin. Code r. 661-300.5