Iowa Admin. Code r. 567-113.13

Current through Register Vol. 47, No. 5, September 4, 2024
Rule 567-113.13 - Postclosure care requirements

All MSWLFs shall comply with the following postclosure care requirements.

(1) Following closure of each MSWLF unit, the owner or operator must conduct postclosure care. Postclosure care must be conducted for 30 years, except as provided under subrule 113.13(2), and consist of at least the following:
a. Maintaining the integrity and effectiveness of any final cover, including making repairs to the cover as necessary to correct the effects of settlement, subsidence, erosion, or other events, and preventing run-on and runoff from eroding or otherwise damaging the final cover;
b. Maintaining and operating the leachate collection system in accordance with the requirements in paragraphs 113.7(5)"b" and 113.8(3)"i," if applicable. The department may allow the owner or operator to stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to human health and the environment;
c. Monitoring the groundwater in accordance with the requirements of rule 113.10(455B) and maintaining the groundwater monitoring system; and
d. Maintaining and operating the gas monitoring system in accordance with the requirements of rule 113.9(455B).
(2) The length of the postclosure care period may be:
a. Decreased by the department if the owner or operator demonstrates that the reduced period is sufficient to protect human health and the environment and this demonstration is approved by the department; or
b. Increased by the department if the department determines that the lengthened period is necessary to protect human health and the environment.
(3) The owner or operator of all MSWLF units must prepare a written postclosure plan that includes, at a minimum, the following information:
a. A description of the monitoring and maintenance activities required in subrule 113.13(1) for each MSWLF unit, and the frequency at which these activities will be performed;
b. Name, address, and telephone number of the person or office to contact about the facility during the postclosure period; and
c. A description of the planned uses of the property during the postclosure period. Postclosure use of the property shall not disturb the integrity of the final cover, liner(s), or any other components of the containment system, or the function of the monitoring systems unless necessary to comply with the requirements in this chapter. The department may approve any other disturbance if the owner or operator demonstrates that disturbance of the final cover, liner or other component of the containment system, including any removal of waste, will not increase the potential threat to human health or the environment.
(4) The owner or operator must notify the department that a postclosure plan has been prepared and placed in the operating record by the date of initial receipt of waste.
(5) Following completion of the postclosure care period for each MSWLF unit, the owner or operator must submit to the department a certification, signed by an independent professional engineer (PE.) registered in Iowa, verifying that postclosure care has been completed in accordance with the postclosure plan. Upon department approval, the certification shall be placed in the operating record.

Iowa Admin. Code r. 567-113.13