Current through Register Vol. 47, No. 8, October 30, 2024
Rule 567-73.16 - Lands, easements, and rights-of-wayAn application for approval of a dam project shall include information showing the nature and extent of lands, easements, and rights-of-way that the applicant has acquired or proposes to acquire to satisfy the following criteria:
(1) Ownership or perpetual easements shall be obtained for the area to be occupied by the dam embankment, spillways, and appurtenant structures, and the permanent or maximum normal pool.(2) Ownership or easements shall be obtained for temporary flooding of areas that would be inundated by the flood pool up to the top of dam elevation and for spillway discharge areas.(3) Easements covering areas affected by temporary flooding or spillway discharges shall include provisions prohibiting the erection and usage of structures for human habitation or commercial purposes without prior approval by the department.(4) As a condition of granting approval of a dam rated less than high hazard, the applicant may be required to acquire control over lands downstream from the dam as necessary to prevent downstream development which would affect the hazard classification of the dam.Iowa Admin. Code r. 567-73.16
Amended by IAB September 8, 2021/Volume XLIV, Number 5, effective 10/13/2021