Iowa Admin. Code r. 567-40.5

Current through Register Vol. 47, No. 6, September 18, 2024
Rule 567-40.5 - Public water supply operation permit application procedures

A person requesting a water supply operation permit pursuant to 567-432. (455B) must complete the appropriate application form, which will be provided by the department. Upon receipt of a completed application, the department will review the application and, if approved, will prepare and issue a water supply operation permit or draft permit, as applicable, and transmit it to the applicant. An annual operation fee pursuant to 567-subrule 43.2(1) is due by September 1 of each year. A permit or renewal will be denied when the applicant does not meet one or more requirements for issuance or renewal of this permit. An operation permit may be denied for any of the following reasons: system failed to pay the operation fee; system is not viable; system is not in compliance with the applicable maximum contaminant levels, treatment techniques, or action levels; system is in significant noncompliance with the provisions of 567-Chapter 41, 42, or 43.

Iowa Admin. Code r. 567-40.5