Iowa Admin. Code r. 129-21.8

Current through Register Vol. 47, No. 6, September 18, 2024
Rule 129-21.8 - Certification of completion and field testing

To the extent applicable, after an installation of broadband infrastructure certified by the office is fully installed in a targeted service area, the communications service provider for which a certification was issued must certify to the office that such installation facilitates broadband service at or above the download and upload speeds specified in the definition of targeted service area. The office may, in its discretion, conduct field tests for compliance with the requirements of Iowa Code section 427.1(40)"b" at any time after broadband service is available in a targeted service area. Such field tests may include but not be limited to speed tests from any location in a targeted service area in which the project was deployed or, in the case of wireline installations, the communications service provider's network operation center or central office. As applicable, noncompliance may be reported to the attorney general, the department of revenue, or applicable county board of supervisors.

Iowa Admin. Code r. 129-21.8

Adopted by IAB October 26, 2016/Volume XXXIX, Number 09, effective 11/30/2016
Amended by IAB August 14, 2019/Volume XLII, Number 4, effective 9/18/2019