Authority: IC 25-31-1-7; IC 25-31-1-8
Affected: IC 25-31-1
Sec. 6.
The engineer may accept an assignment requiring education or experience outside of the engineer's field of competence, but only to the extent that services are restricted to those phases of the project in which the engineer is qualified. All other phases of such project shall be performed by qualified associates, consultants, or employees.
864 IAC 1.1-11-6