Authority: IC 25-28.5-1-7
Affected: IC 25-28.5-1-27.1
Sec. 6.
Whenever required to do so by an ordinance of a political subdivision, plumbing contractors shall obtain permits to do plumbing work.
860 IAC 1-5-6
Authority: IC 25-28.5-1-7
Affected: IC 25-28.5-1-27.1
Sec. 6.
Whenever required to do so by an ordinance of a political subdivision, plumbing contractors shall obtain permits to do plumbing work.
860 IAC 1-5-6