Current through September 4, 2024
Section 80 IAC 7-1-3 - "Change order" definedAuthority: IC 15-13-2-9
Affected: IC 15-13-2
Sec. 3.
"Change order" means a written order that:
(1) is signed by the executive director or his or her designated representative; and(2) directs the contractor to make changes to the specifications outlined in the original contract.State Fair Commission; 80 IAC 7-1-3; filed 11/7/2016, 3:46 p.m.: 20161207-IR-080160210FRAReadopted filed 11/15/2022, 10:12 a.m.: 20221214-IR-080220291RFA