760 Ind. Admin. Code 1-15.1-9

Current through January 8, 2025
Section 760 IAC 1-15.1-9 - Forms; extensions of time to file

Authority: IC 27-1-3-7

Affected: IC 27-1-23

Sec. 9.

If it is impractical to furnish any required information, document, or report at the time it is required to be filed, there may be filed with the commissioner as a separate document an application:

(1) identifying the information, document, or report in question;
(2) stating why the filing thereof at the time required is impractical; and
(3) requesting an extension of time for filing the information, document, or report to a specified date.

The application shall be deemed granted unless the commissioner within thirty (30) days after receipt thereof shall deny the application.

760 IAC 1-15.1-9

Department of Insurance; 760 IAC 1-15.1-9; filed Oct 18, 1994, 3:55 p.m.: 18 IR 527; readopted filed Sep 14, 2001, 12:22 p.m.: 25 IR 531; readopted filed Nov 27, 2007, 4:01 p.m.: 20071226-IR-760070717RFA; readopted filed November 26, 2013, 3:43 p.m.: 20131225-IR-760130479RFA
Readopted filed 11/19/2019, 9:18 a.m.: 20191218-IR-760190497RFA