Current through December 25, 2024
Section 68 IAC 24-3-23 - Bout contractsAuthority: IC 4-33-22-12
Affected: IC 4-33-22
Sec. 23.
(a) A promoter must execute a contract with a fighter before the fighter may be allowed to participate in a bout.(b) A contract between a promoter and a fighter must be:(1) executed on a form prescribed by the executive director or the executive director's designee;(2) signed by the parties thereto; and(3) filed with the executive director or the executive director's designee not later than forty-eight (48) hours prior to the event.Indiana Gaming Commission; 68 IAC 24-3-23; filed Aug 28, 2012, 1:57 p.m.: 20120926-IR-068110385FRAReadopted filed 9/19/2018, 4:09 p.m.: 20181017-IR-068180283RFAReadopted filed 10/1/2024, 9:32 a.m.: 20241030-IR-068230797RFA