Authority: IC 22-12-2-8; IC 22-15-6-2
Affected: IC 22-15-6
Sec. 12.
If performed by request, a fee for an inspection made by a state inspector may be charged in accordance with the operating permit inspection fees listed in 675 IAC 12-3-13, regardless of whether the inspection is being performed for purposes of obtaining an operating permit.
675 IAC 30-5-12
Transferred from the Boiler and Pressure Vessel Rules Board ( 680 IAC 2-5-12) to the Fire Prevention and Building Safety Commission ( 675 IAC 30-5-12) by P.L. 249-2019, SECTION 15, effective July 1, 2019.