675 Ind. Admin. Code 30-10-7

Current through January 8, 2025
Section 675 IAC 30-10-7 - Water gage glasses; location

Authority: IC 22-13-2-8

Affected: IC 22-15-6

Sec. 7.

Each steam heating boiler shall have at least one (1) water gauge glass with the lowest visible part above the heating surfaces in the primary combustion chamber. When the heating surfaces above the low water line may be injured by contact with gases of high temperature, the water gauge shall be raised until the lowest visible part of the gauge glass is above such heating surface.

675 IAC 30-10-7

Fire Prevention and Building Safety Commission; 675 IAC 30-10-7; filed Jan 5, 1996, 10:15 a.m.: 19 IR 1134; readopted filed Jul 9, 2001, 1:33 p.m.: 24 IR 3822; readopted filed Sep 21, 2007, 9:16 a.m.: 20071010-IR-680070389RFA; readopted filed Oct 19, 2007, 1:08 p.m.: 20071114-IR-680070389RFA; readopted filed Sep 5, 2013, 10:09 a.m.: 20131009-IR-680130182RFA; readopted filed 9/4/2019, 2:20 p.m.: 20191002-IR-675190336RFA
Filed 4/28/2021, 11:03 a.m.: 20210526-IR-675200627FRA, eff 7/1/2021

Transferred from the Boiler and Pressure Vessel Rules Board ( 680 IAC 2-10-7) to the Fire Prevention and Building Safety Commission ( 675 IAC 30-10-7) by P.L. 249-2019, SECTION 15, effective July 1, 2019.