675 Ind. Admin. Code 12-6-10

Current through May 29, 2024
Section 675 IAC 12-6-10 - Predesign conferences

Authority: IC 22-13-2-13

Affected: IC 22-15-3

Sec. 10.

An applicant may request in writing consultation with representatives of the division for the purpose of resolving questions on the application of the rules of the commission to a specific project. The results of any consultations shall:

(1) not be binding on the division in the consideration of an application for a design release; and
(2) in no way serve as a substitute for the authority of the commission to grant or deny variances under 675 IAC 12-5.

675 IAC 12-6-10

Fire Prevention and Building Safety Commission; 675 IAC 12-6-10; filed Jul 17, 1987, 2:30 p.m.: 10 IR 2693, eff Aug 1, 1987 [IC 4-22-2-36 suspends the effectiveness of a rule document for 30 days after filing with the Secretary of State. LSA Document #87-53 was filed Jul 17, 1987.]; filed Nov 20, 2000, 3:25 p.m.: 24 IR 1006; readopted filed Sep 11, 2001, 2:49 p.m.: 25 IR 530; filed Aug 30, 2006, 2:25 p.m.: 20060927-IR-675050108FRA; readopted filed Sep 21, 2007, 9:20 a.m.: 20071010-IR-675070388RFA; readopted filed Oct 10, 2007, 9:16 a.m: 20071031-IR-675070388RFA; readopted filed Aug 8, 2012, 8:08 a.m.: 20120905-IR-675120260RFA
Readopted filed 7/3/2018, 2:22 p.m.: 20180801-IR-675180204RFA