Authority: IC 16-19-3-4; IC 16-19-3-5
Affected: IC 16-19-3-4
Sec. 84.
Table VIII - Required Effluent Pump Discharge Rates for Subsurface Trench Flood Dosed On-Site Sewage Systems | |
Design Daily Flow | Discharge Rate in Gallons per Minute |
150-299 | 30-35 |
300-449 | 30-35 |
450-599 | 30-45 |
600-749 | 30-60 |
750-899 | 38-75 |
900+ | 45-90 |
Table IX - Frost Penetrations in Indiana (in inches) | |||||||
Adams | 60 | Franklin | 48 | Lawrence | 48 | Rush | 54 |
Allen | 60 | Fulton | 60 | Madison | 60 | St. Joseph | 60 |
Bartholomew | 48 | Gibson | 42 | Marion | 54 | Scott | 36 |
Benton | 60 | Grant | 54 | Marshall | 60 | Shelby | 54 |
Blackford | 60 | Greene | 54 | Martin | 48 | Spencer | 36 |
Boone | 54 | Hamilton | 54 | Miami | 60 | Starke | 60 |
Brown | 48 | Hancock | 54 | Monroe | 48 | Steuben | 60 |
Carroll | 60 | Harrison | 36 | Montgomery | 60 | Sullivan | 54 |
Cass | 60 | Hendricks | 54 | Morgan | 48 | Switzerland | 42 |
Clark | 36 | Henry | 54 | Newton | 60 | Tippecanoe | 60 |
Clay | 54 | Howard | 60 | Noble | 60 | Tipton | 60 |
Clinton | 54 | Huntington | 60 | Ohio | 42 | Union | 48 |
Crawford | 36 | Jackson | 48 | Orange | 42 | Vanderburgh | 36 |
Daviess | 48 | Jasper | 60 | Owen | 54 | Vermillion | 60 |
Dearborn | 48 | Jay | 60 | Parke | 60 | Vigo | 60 |
Decatur | 48 | Jefferson | 42 | Perry | 36 | Wabash | 60 |
Dekalb | 60 | Jennings | 48 | Pike | 42 | Warren | 60 |
Delaware | 60 | Johnson | 54 | Porter | 60 | Warrick | 36 |
Dubois | 42 | Knox | 48 | Posey | 42 | Washington | 36 |
Elkhart | 60 | Kosciusko | 60 | Pulaski | 60 | Wayne | 54 |
Fayette | 54 | LaGrange | 60 | Putnam | 54 | Wells | 60 |
Floyd | 36 | Lake | 60 | Randolph | 54 | White | 60 |
Fountain | 60 | LaPorte | 60 | Ripley | 48 | Whitley | 60 |
Table X - Friction Losses in Plastic Pipe (per 100 feet of pipe) | ||||||||||||||
Pipe Diameter, Flow (gpm), Velocity (v)2, and Friction Loss Head (Hf)1 | ||||||||||||||
Flow (gpm) | 1" | 1 1/4" | 1 1/2" | 2" | 2 1/2" | 3" | 4" | |||||||
Q | v | Hf | v | Hf | v | Hf | v | Hf | v | Hf | v | Hf | v | Hf |
1 | 0.37 | 0.11 | ||||||||||||
2 | 0.74 | 0.38 | 0.43 | 0.10 | ||||||||||
3 | 1.11 | 0.78 | 0.64 | 0.21 | 0.47 | 0.10 | ||||||||
4 | 1.49 | 1.31 | 0.86 | 0.35 | 0.63 | 0.16 | ||||||||
5 | 1.86 | 1.92 | 1.07 | 0.52 | 0.79 | 0.24 | ||||||||
6 | 2.23 | 2.70 | 1.29 | 0.71 | 0.95 | 0.33 | 0.57 | 0.10 | ||||||
8 | 2.97 | 4.59 | 1.72 | 1.19 | 1.26 | 0.56 | 0.77 | 0.17 | ||||||
10 | 3.71 | 6.90 | 2.15 | 1.78 | 1.58 | 0.83 | 0.96 | 0.25 | 0.67 | 0.11 | ||||
15 | 5.57 | 14.7 | 3.22 | 3.76 | 2.37 | 1.74 | 1.43 | 0.52 | 1.01 | 0.22 | ||||
20 | 7.43 | 25.2 | 4.29 | 6.42 | 3.16 | 2.96 | 1.91 | .87 | 1.34 | 0.37 | 0.87 | 0.13 | ||
25 | 9.28 | 38.6 | 5.37 | 9.74 | 3.94 | 4.46 | 2.39 | 1.29 | 1.68 | 0.54 | 1.09 | 0.19 | ||
30 | 6.44 | 13.6 | 4.73 | 6.27 | 2.87 | 1.81 | 2.01 | 0.76 | 1.30 | 0.26 | ||||
35 | 7.51 | 18.2 | 5.52 | 8.40 | 3.35 | 2.42 | 2.35 | 1.01 | 1.52 | 0.35 | 0.88 | 0.10 | ||
40 | 8.59 | 23.6 | 6.30 | 10.7 | 3.83 | 3.12 | 2.68 | 1.28 | 1.74 | 0.44 | 1.01 | 0.12 | ||
45 | 7.09 | 13.5 | 4.30 | 3.85 | 3.02 | 1.54 | 1.95 | 0.55 | 1.13 | 0.15 | ||||
50 | 7.88 | 16.5 | 4.78 | 4.68 | 3.35 | 1.93 | 2.17 | 0.67 | 1.26 | 0.18 | ||||
60 | 9.47 | 23.6 | 5.74 | 6.62 | 4.02 | 2.72 | 2.60 | 0.94 | 1.51 | 0.25 | ||||
70 | 6.70 | 8.86 | 4.69 | 3.67 | 3.04 | 1.25 | 1.76 | 0.33 | ||||||
80 | 7.65 | 11.5 | 5.36 | 4.69 | 3.47 | 1.59 | 2.02 | 0.42 | ||||||
90 | 8.60 | 14.3 | 6.03 | 5.83 | 3.91 | 1.99 | 2.27 | 0.52 | ||||||
100 | 6.70 | 7.13 | 4.34 | 2.42 | 2.52 | 0.63 | ||||||||
125 | 8.38 | 10.9 | 5.43 | 3.72 | 3.15 | 0.96 | ||||||||
150 | 6.51 | 5.16 | 3.78 | 1.34 | ||||||||||
175 | 7.60 | 6.90 | 4.41 | 1.79 | ||||||||||
200 | 8.68 | 8.93 | 5.04 | 2.27 | ||||||||||
225 | 5.67 | 2.84 | ||||||||||||
250 | 6.30 | 3.37 | ||||||||||||
275 | 6.93 | 4.13 | ||||||||||||
300 | 7.56 | 4.87 | ||||||||||||
325 | 8.19 | 5.70 | ||||||||||||
1 This figure is based on flows for PVC Schedule 40 pipe (flow coefficient: C-150). Other values for friction loss may be used if documentation from the pipe manufacturer is provided with the plan submittal. Calculations using the Hazen-Williams equation may be used if provided with the plan submittal. | ||||||||||||||
2 Flow velocity must be at least 2 fps; flow velocities above 5 fps should be avoided. |
Table XI - Plastic Pipe Fittings: Friction Loss - Equivalent Length of Straight Pipe (ft.)* | |||||||
Fitting: | 1" | 1 1/4" | 1 1/2" | 2" | 2 1/2" | 3" | 4" |
90° elbow, standard sharp, inside radius | 5.3 | 6.7 | 7.5 | 8.6 | 9.3 | 11.1 | 13.1 |
90° elbow, long sweep radius | 2.5 | 3.8 | 4.0 | 5.7 | 6.9 | 7.9 | 12.0 |
45° elbow, standard | 1.4 | 1.8 | 2.1 | 2.6 | 3.1 | 4.0 | 5.1 |
Tee Flow (run flow) | 1.7 | 2.3 | 2.7 | 4.3 | 5.1 | 6.2 | 8.3 |
Tee Flow (branch flow) | 6.0 | 7.0 | 8.0 | 12.0 | 15.0 | 16.0 | 22.0 |
Gate Valve | 0.6 | 0.8 | 1.0 | 1.5 | 1.6 | 2.0 | 3.0 |
Male/Female adapter | 2.0 | 2.8 | 3.5 | 4.5 | 5.5 | 6.5 | 9.0 |
*Assigned values. Other values for friction loss may be used if documentation from the pipe manufacturer is provided with the plan submittal. |
410 IAC 6-10.1-84