Current through November 6, 2024
Section 410 IAC 6-10.1-85 - Subsurface trench alternating field on-site sewage systems: design and construction requirementsAuthority: IC 16-19-3-4; IC 16-19-3-5
Affected: IC 16-19-3-4
Sec. 85.
(a) Subsurface trench alternating field on-site sewage systems shall meet all of the requirements of: (1) sections 82 and 83 of this rule; and(b) Each side of the soil absorption system shall contain the total square footage of soil absorption area calculated from section 82(a) of this rule.(c) A diversion valve shall be installed between the septic tank and the distribution boxes. An access riser, extending to the ground surface, shall be installed over the diversion valve.Indiana State Department of Health; 410 IAC 6-10.1-85; filed Oct 19, 2012, 2:07 p.m.: 20121114-IR-410120157FRAReadopted filed 9/26/2018, 2:48 p.m.: 20181024-IR-410180328RFA