410 Ind. Admin. Code 32-1-14

Current through November 6, 2024
Section 410 IAC 32-1-14 - "Completion date" defined

Authority: IC 16-41-39.8-6

Affected: IC 16-41-39.8

Sec. 14.

"Completion date" means the date by which a final visual inspection and clearance sampling have been completed by the Indiana licensed risk assessor or inspector, and the risk assessor or inspector has determined that no dust, debris, or residue is present in the work area, and warning signs and demarcation can be removed.

410 IAC 32-1-14

Indiana State Department of Health; 410 IAC 32-1-14; filed Jan 6, 1999, 4:28 p.m.: 22 IR 1433; readopted filed Jan 10, 2001, 3:20 p.m.: 24 IR 1477; filed Sep 10, 2003, 4:24 p.m.: 27 IR 461; readopted filed Jul 14, 2011, 11:42 a.m.: 20110810-IR-410110253RFA
Readopted filed 9/13/2017, 4:08 p.m.: 20171011-IR-410170339RFA
Readopted filed 11/28/2023, 12:13 p.m.: 20231227-IR-410230638RFA

Transferred from the Air Pollution Control Board (326 IAC 23-1-10) to the Indiana State Department of Health (410 IAC 32-1-14) by P.L. 57-2009, SECTION 17, effective July 1, 2009.