329 Ind. Admin. Code 8-4-1

Current through September 4, 2024
Section 329 IAC 8-4-1 - Requirements

Authority: IC 13-20-20-13

Affected: IC 13-20-20

Sec. 1.

(a) An applicant must submit the following information for eligibility:
(1) Estimated project costs submitted to the department must include both eligible and ineligible costs. The ineligible project costs for grant funding may not be used to fulfill a grantee's match requirement. Furthermore, a grantee is responsible for all project costs except the costs funded by the grant.
(2) Ineligible project costs are the following:
(A) Costs incurred before the approval of a grant.
(B) Costs incurred more than twelve (12) months after a grant has been accepted.
(C) Costs incurred by a grantee that exceed original estimated eligible project costs indicated in a grant program application.
(D) Other costs that are not specifically related to a project as determined by the department.
(3) Eligible project costs include the following:
(A) Costs used to fulfill the grantee's match requirements.
(B) Costs funded by the grant.
(b) Project costs that are not ineligible under subsection (a)(2) are eligible project costs for purposes of subsection (a)(3).

329 IAC 8-4-1

Solid Waste Management Board; 329 IAC 8-4-1; filed Aug 27, 1992, 9:00 a.m.: 16 IR 34; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535; readopted filed May 14, 2007, 1:53 p.m.: 20070523-IR-329070138BFA
Readopted filed Jul 29, 2013, 9:20 a.m.: 20130828-IR-329130179BFA; readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA