"Existing tank system" or "existing component" means a tank system or component that is used for the storage or treatment of hazardous waste and that is in operation, or for which installation has commenced on or prior to June 20, 1988. Installation will be considered to have commenced if the owner or operator has obtained all federal, state, and local approvals or permits necessary to begin physical construction of the site or installation of the tank system and if either:

(1) a continuous on-site physical construction or installation program has begun; or
(2) the owner or operator has entered into contractual obligations that cannot be canceled or modified without substantial loss for physical construction of the site or installation of the tank system to be completed within a reasonable time.

329 IAC 3.1-4-11

Solid Waste Management Board; 329 IAC 3.1-4-11; filed Jan 24, 1992, 2:00 p.m.: 15 IR 921; filed Jul 18, 1996, 3:05 p.m.: 19 IR 3354; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535