Current through October 23, 2024
Section 329 IAC 13-9-6 - NoticesAuthority: IC 13-14-8-1; IC 13-14-8-2; IC 13-19-3
Affected: IC 13-11-2; IC 13-14; IC 13-19; IC 13-20; IC 13-22; IC 13-23; IC 13-30
Sec. 6.
(a) Before a used oil generator, transporter, or processor or re-refiner directs the first shipment of off-specification used oil fuel to a burner, the used oil generator, transporter, or processor or re-refiner must obtain a one (1) time written and signed notice from the burner certifying the following: (1) The burner has notified EPA or the department stating the location and general description of used oil management activities.(2) The burner will burn the off-specification used oil only in an industrial furnace or boiler identified in 329 IAC 13-8-2(a).(b) The certification described in this section must be maintained for three (3) years from the date the last shipment of off-specification used oil is shipped to the burner.Solid Waste Management Board; 329 IAC 13-9-6; filed Feb 3, 1997, 9:15 a.m.: 20 IR 1513; readopted filed Jan 10, 2001, 3:25 p.m.: 24 IR 1535