329 Ind. Admin. Code 11-5-7

Current through September 4, 2024
Section 329 IAC 11-5-7 - Existing facilities requiring a permit

Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1

Affected: IC 13-30-2; IC 36-9-30

Sec. 7.

(a) A solid waste processing facility described in section 1(b)(2) of this rule that is operating on the effective date of the 2007 amendments to this article must do the following:
(1) Notify the department within thirty (30) days after the effective date of the 2007 amendments to this article of one (1) of the following:
(A) A permit application will be submitted.
(B) The facility will cease operation within sixty (60) days.
(2) If the facility will continue to operate, submit a complete application as required by 329 IAC 11-9-1 and 329 IAC 11-9-2 within sixty (60) days after the effective date of the 2007 amendments to this article.
(b) The facility must be operated under the applicable requirements of this article until the:
(1) permit for the facility is effective; or
(2) facility ceases operation.

329 IAC 11-5-7

Solid Waste Management Board; 329 IAC 11-5-7; filed Feb 13, 2008, 1:38 p.m.: 20080312-IR-329050297FRA; readopted filed Aug 6, 2014, 9:49 a.m.: 20140903-IR-329140187BFA
Readopted filed Jun 14, 2019, 2:00 p.m.: 20190710-IR-329190249BFA